Handling Dual Responses from Device

When the “Load Slot” command is sent to the device, the device can respond with the following options.

Option 1

  1. Slot loading in progress > Slot can be loaded > Loading in progress
  2. Slot loaded successfully.

Two responses one after the other.

Option 2

  1. Slot loading in progress > Slot can be loaded > Loading in progress >
  2. Slot loading failed.

Single Error response – Slot loading failed.

In the first two cases, between the first response and the second response, you will be blocked from taking any action in GTT.
The following progress dialogue box will be displayed.

If the second reply is not received within 15 seconds, GTT will unblock itself and report an error.